Global quality certification for the scope of electrical installations, power system operation & maintenance, electrical construction, and energy trading.
Reducing environmental impact through a structured system. Tangible evidence of our commitment to sustainability in every project.
K3 management system verified by the Indonesian Ministry of Manpower with 64 criteria, demonstrating superior safety culture.
Business Entity Certificate from the Ministry of Energy and Mineral Resources for High Voltage, Extra High Voltage, and Ultra High Voltage Power Transmission Network activities. Medium qualification, valid until June 12, 2030.
Official Business Entity Certificate from the Directorate General of Electricity for the substation sub-sector with Medium qualification. Covers construction and installation of substation electrical installations throughout Indonesia.
Expert in XLPE 150kV cable jointing. Proficient in Outdoor Termination, Straight Joint, Insulated Joint & GIS Sealing End installation.
Qualified as chief jointer, leading extra high voltage (EHV) cable accessory installations up to 150kV with high precision.
Certified in Straight through Joint & Insulated Joint installation of pre-molded type. Expert in EHV cable accessory design theory.
Competent in 150kV XLPE cable accessory installation, authorized to perform jointing work according to LS Cable & System standards.
Successful completion of GIS Cawang 150kV substation upgrade with zero accident record and ahead of schedule. Recognized as one of the most challenging urban substation projects in Jakarta.
Installation of 150kV underground cable jointing with LS premium kit. Successfully completed 150 points of jointing with full testing and commissioning. One of the largest underground cable projects in West Java.
Successfully completed 66 points of cable jointing for MRT Jakarta Phase 1 project. Critical infrastructure supporting Jakarta's first mass rapid transit system with highest safety standards.
Termination and jointing works for PLTGU Gresik, one of the largest gas-fired power plants in East Java. Completed 12 points of 150kV termination with LS cable accessories.
Successfully completed cable termination and jointing works for Asahan hydropower plant in North Sumatra. Contributing to renewable energy infrastructure development in Indonesia.
Major jointing project for Bali's power grid reinforcement. Completed 150 jointing points to improve electricity reliability for the island's growing tourism and residential needs.